PACKAGE SPECIFICATIONS

Understanding your manpower and cash issues can determine the success or failure of any project. Do not overestimate your capabilities or underestimate your cash flow.  Map out the details of all of the projects going on and what you are bidding that could happen in the near future.

OUTFALL PIPELINE

  • Excavation of Trench, Pipe Laying, Testing and Backfilling.
  • Construction of Rock Bund Structure (Rock Revetment).

INTAKE PIPELINE

  • Excavation/Dredging on sea bed level, Pipe Laying under sea water including marine collars.
  • Horizontal Direction Drilling for Pipe in Trenchless Area.

PROJECT DETAILS

Project Details Shortcode only available for "Projects" content type.

CONTACT

Musaffah Industrial Area- ICAD 1, Abudhabi, UAE

(971) 251 344 16

info@allmarineuae.com

(971) 025 511 211

Mon – Fri: 9:00 – 18:00