Design and Construction of Travel Lift

This project involves the design and construction of a Travel Lift facility at Al Taweelah Camp, developed to support marine operations, vessel handling, and maintenance activities. The facility is being constructed to enhance operational efficiency for lifting, transporting, and servicing marine craft within the site.

Executed for NGC, the project includes structural works, mechanical integration, and supporting civil infrastructure required for the safe operation of the travel lift system. The works are being carried out in accordance with strict engineering standards, ensuring durability, safety, and long-term operational reliability in a marine environment.

As the Main Contractor, the project commenced in December 2024 and is currently ongoing, with a total contract value of AED 9,750,000. The execution is progressing in line with project milestones, maintaining high standards of quality control, safety compliance, and site coordination.

Project No.

NG/LG1/C&M/11/2024/65

Location:

Al Taweelah Camp, Abu Dhab

Client:

NGC

Contract Value:

AED 9,750,000

Duration:

Dec 2024 – (Ongoing

Status:

Ongoing

Role:

Main Contractor

Category
AF Current Projects, AF Project List, Current Project List