All Marine – Marine Pipeline

Marine Pipeline

The installation of large-diameter HDPE pipelines on the seabed is a highly technical procedure that requires meticulous planning. ALL MARINE typically employs a controlled sinking technique, achieved by gradually flooding the pipeline.

Skilled diving teams are engaged to ensure accurate positioning of the pipeline, maintaining the highest standards of safety and precision throughout the entire installation process.

Marine Pipeline
2024 / ongoing
Department of Municipalities and Transport | Al Dhafrah Municipality Design and Construction of the Rock Protection of the Coast in Front of the Runway of Delma Island Airport.
2024 / ongoing
Department of Municipalities and Transport | Al Dhafrah Municipality Rehabilitation of Ras Ghumais Road to Ghagha Island after Checkpoint
2025 / ongoing
Dredging, breakwater construction and berthing facility at Abu Dhabi.
2023 – Jebel Dhana Slip way